# Implementation Roadmap ## Purpose This document is the handoff-oriented implementation plan for the project. It is intentionally short and execution-focused. A new agent should be able to read this file, understand the current project state, and immediately know what to build next without re-deriving the whole design. ## Current Status As of now: - architecture and workflow docs are written - CLI surfaces for `inbox`, `orch`, worktree execution, and `council-review` are defined - embedded SQLite schema and migrations exist in code - JSON output shapes are defined for the major flows - Go module and initial command skeletons exist - `inbox` and `orch` both compile - shared SQLite schema initialization exists - `inbox` is implemented end-to-end, including send/fetch/claim/renew/update/reply/done/fail/cancel/list/show/watch/wait-reply - `inbox` supports blocking waits, lease renewal, unread fetches, `--body-file`, artifact attachments, and structured JSON errors with stable exit codes - integration tests cover the main inbox lifecycle, wait/watch flows, artifact persistence, and JSON error contracts - `orch` currently exists as a command skeleton only - no scheduler workflows have been implemented yet This means the project is past design discovery and ready for `orch` implementation. ## Source Of Truth Read these docs first: - [architecture.md](/home/kurihada/project/ai-workflow-skill/docs/architecture.md) - [inbox-cli.md](/home/kurihada/project/ai-workflow-skill/docs/inbox-cli.md) - [orch-cli.md](/home/kurihada/project/ai-workflow-skill/docs/orch-cli.md) - [worktree-execution.md](/home/kurihada/project/ai-workflow-skill/docs/worktree-execution.md) - [council-review.md](/home/kurihada/project/ai-workflow-skill/docs/council-review.md) Use this roadmap for implementation order, not for protocol design. ## Project Goal Build a Go-based local agent orchestration stack with: - `inbox`: worker-facing durable coordination bus - `orch`: leader-facing scheduler and control plane - strict worktree-backed execution for code-writing task attempts - `council-review`: a user-facing three-reviewer brainstorm workflow implemented on top of `orch` ## Implementation Principles - Do not redesign the protocol unless implementation reveals a real contradiction. - Keep `inbox` and `orch` as separate CLIs or command groups, but share one SQLite file. - Prefer one small working path over broad unfinished scaffolding. - Make JSON output stable early. - Implement the happy path first, then add wait/retry/cleanup. ## Recommended v1 Order ## Progress Snapshot Current implementation status: - `Milestone 1: Go Skeleton` is complete - `Milestone 2: Shared DB Layer` is complete enough for both CLIs - `Milestone 3: Inbox Happy Path` is complete - `Milestone 6: Waiting Primitives` is partially complete through `inbox wait-reply` The next practical coding target is `Milestone 4: Orch Core Scheduling`. ### Milestone 1: Go Skeleton Goal: - initialize the Go module - choose CLI framework and SQLite driver - create package layout - make empty commands compile Recommended shape: - `cmd/inbox` - `cmd/orch` - `internal/db` - `internal/store` - `internal/protocol` - `internal/cli` Definition of done: - `go build ./...` succeeds - `inbox --help` works - `orch --help` works Status: - completed ### Milestone 2: Shared DB Layer Goal: - create the SQLite connection layer - enable required pragmas - add schema initialization and migration mechanism Minimum scope: - communication tables for `inbox` - scheduling tables for `orch` - shared `events` table Definition of done: - `inbox init` initializes the database - `orch` can open the same database successfully Status: - completed for current inbox needs Completed so far: - shared DB open layer exists - required SQLite pragmas are applied - embedded schema files exist - `inbox init` applies schema successfully Remaining: - decide whether `orch` should gain an explicit DB bootstrap check or continue to rely on `inbox init` ### Milestone 3: Inbox Happy Path Goal: - implement worker-facing coordination primitives first First commands: - `inbox init` - `inbox send` - `inbox fetch` - `inbox claim` - `inbox update` - `inbox reply` - `inbox done` - `inbox fail` - `inbox show` Delay if needed: - `watch` - `wait-reply` - `cancel` - `list` Definition of done: - one thread can be created, claimed, updated, replied to, and completed - all major commands support `--json` Status: - completed Completed so far: - `inbox init` - `inbox send` - `inbox fetch` - `inbox claim` - `inbox renew` - `inbox update` - `inbox reply` - `inbox done` - `inbox fail` - `inbox cancel` - `inbox list` - `inbox show` - `inbox watch` - `inbox wait-reply` ### Milestone 4: Orch Core Scheduling Goal: - implement run/task/dependency/attempt orchestration on top of `inbox` First commands: - `orch run init` - `orch task add` - `orch dep add` - `orch ready` - `orch dispatch` - `orch reconcile` - `orch blocked` - `orch answer` - `orch status` Delay if needed: - `retry` - `reassign` - `cancel` - `cleanup` - `wait` Definition of done: - a leader can create a run - add tasks and dependencies - dispatch a task through `orch` - see worker state reflected back after `reconcile` ### Milestone 5: Strict Worktree Support Goal: - ensure code-writing tasks execute in isolated worktrees First scope: - `orch dispatch` resolves `base_ref` - strict mode fails when the repo is dirty and no explicit base is provided - worktree path and branch name are stored on the attempt Definition of done: - a code task dispatch creates a real worktree - the assigned worktree path appears in attempt metadata and inbox payload ### Milestone 6: Waiting Primitives Goal: - replace blind polling with blocking CLI waits Commands: - `orch wait` - `inbox wait-reply` Definition of done: - leader can block on new task events - blocked worker can block on reply events ### Milestone 7: Council Review Goal: - implement the user-facing three-reviewer brainstorming workflow First commands: - `orch council start` - `orch council wait` - `orch council tally` - `orch council report` Definition of done: - one council run can dispatch three reviewers - tally grouped recommendations into `consensus`, `majority`, and `minority` - produce stable JSON and a markdown report artifact ## Immediate Next Task If a new agent is taking over now, the next concrete step should be: 1. implement `inbox send` 2. implement `inbox fetch` 3. implement `inbox claim` 4. add a small integration test covering `init -> send -> fetch -> claim` This is the smallest meaningful slice because the project already has a compiling skeleton and working schema initialization. ## Recommended Driver Choices Current recommendation: - CLI framework: `Cobra` - SQLite driver: pure-Go driver Reason: - command surfaces are already command-group heavy - pure-Go SQLite keeps distribution simpler ## Suggested Early Tests Add these tests before the codebase grows too much: - schema init test - inbox thread lifecycle test - single-task orch dispatch and reconcile test - worktree path generation test - council tally grouping test ## Out Of Scope For First Pass Do not block v1 on these: - distributed execution - advanced auth or permissions - patch-producing council mode - configurable reviewer counts beyond three - rich similarity engines for proposal grouping - background daemons beyond blocking CLI commands ## Handoff Notes For Future Agents - The design phase is complete enough to start coding. - Avoid reopening major design questions unless implementation forces it. - The repository already has compiling binaries and working schema init. - Continue with inbox lifecycle commands before adding advanced orchestration. - Preserve the separation: - `inbox` handles communication - `orch` handles scheduling - `council-review` is a workflow on top of `orch` - Treat this file as the implementation entrypoint for new agents.